An integrated three-dimensional model on financing risk evaluation for PPP power plant projects based on WSR
Author(s): Li Ping, Bai BingThis article starts from the risky factors that influence the smooth running of PPP power plant project financing, such as insufficient income, changes in interest rates and so on. On the basis of previous studies, we develop an integrated three-dimensional model for financing risk evaluation of PPP power plant projects based on the WSR systems methodology, so that its "past", "present" and "future" are organically combined. Verifications in case studies show that this model effectively solves the evaluation problems for PPP financing risk and it can make risk control better.